How to Install Engineered Hardwood Floor
Share
Three Ways to Install Engineered Hardwood
Unlike solid hardwood (which must be nailed), engineered hardwood offers three installation methods. The right choice depends on your subfloor type and personal preference.
- Floating - boards click together and float over the subfloor with no fasteners. Fastest and most DIY-friendly.
- Glue-down - boards are glued directly to the subfloor. Best for concrete and radiant heat systems.
- Nail/staple-down - same as solid hardwood installation, requires a wood subfloor.
What You'll Need
- Digital Moisture Meter - check subfloor moisture before starting
- ROBERTS Moisture Barrier 6mil - required for concrete subfloors
- WORKPRO Flooring Installation Kit - tapping block, pull bar, mallet, spacers
- WORKPRO 40-Pack Floor Spacers - maintain expansion gaps
- Construction Adhesive - for glue-down method
- 3PLUS Pneumatic Flooring Nailer - for nail-down method
Step 1: Check Moisture and Acclimate
Use your moisture meter to check the subfloor. For concrete, moisture should be below 3 lbs per 1000 sq ft per 24 hours (use a calcium chloride test). For wood subfloors, readings should be below 12%. Acclimate engineered hardwood in the room for 48-72 hours before installation.
Method A: Floating Floor Installation
- Install moisture barrier over concrete, or underlayment over wood subfloor
- Place spacers along the starting wall to maintain 3/8" to 1/2" expansion gap
- Lay the first row groove-side to the wall
- Click subsequent rows together at an angle, using the tapping block to close joints - never hammer directly on the board
- Stagger end joints by at least 8 inches between rows
- Use the pull bar for the last boards in each row
- Remove spacers and install baseboards to cover the expansion gap
Method B: Glue-Down Installation
- Apply construction adhesive to the subfloor in sections using a trowel
- Press boards firmly into the adhesive, maintaining expansion gaps at walls
- Use a roller to ensure full contact between board and adhesive
- Allow adhesive to cure per manufacturer instructions before foot traffic
Method C: Nail-Down Installation
Follow the same process as solid hardwood nail-down installation using the pneumatic flooring nailer. Requires a minimum 3/4" plywood subfloor.
Finishing Touches
Install transition strips at doorways where engineered hardwood meets other flooring types.
Products Used in This Guide
You Might Also Like
Loading...
Shop Related Products
Loading...